PROJECT REFERENCES
Hot Tap & Plugging Services, Cleaning, Batching & Displacement Pigs, Intelligent Pigging Services, Smart Plugs, Etc.
Relocation of Twin 1200mm Diameter Raw Water Mains for KLCC Ramlee Ramp Project
1988 - FUJITA - BRIDGECON JV, PUNCAK NIAGA SDN BHD
Relocation of Twin 1200mm Diameter Rowater Mains for Jalan Ampang – KL Elevated Highway Project
1999 - PERCON CORPORATION SDN BHD, PUNCAK NIAGA SDN BHD
Relocation of Twin 1200mm Diameter Treated Water Mains for Putrajaya Development Project
2000 - PUNCAK NIAGA SDN BHD, PUTRAJAYA HOLDINGS BHD
Projek Menaiktaraf of Jalan Duta, Jalan Kuching dan Jalan-Jalan Hubungan Lain di Kuala Lumpur
2004 - AHMAD ZAKI SDN BHD, SYABAS
Changlun Hot Tap, Tie-in and Bypass – 36″ Diameter Double Stopple with Temporary Bypass onto Gas Pipeline
2004 - TRANS THAILAND MALAYSIA SDN BHD
Supply of Maintenance Pigs, Accessories and Services
2011-2013 - TALISMAN MALAYSIA LIMITED
Provision of Positive Isolation Plug Services for Kumang Onshore Tie-in Project (Smartplug)
2012 - PETRONAS CARIGALI SDN BHD
Provision to Perform a Double Block & Bleed Isolation at PM0PL45.24″ BRB – RDPA and PM0PL39.28″ RDPA – OGT Pipeline for Valves Changeout Activities (Smarplug)
2012 - PETRONAS CARIGALI SDN BHD
Various Gas Pipeline Relocation Works (GPRW) and Natural Gas Distribution System (NGDS) Projects ont0 16″, 8″, 6″ and 4″ Natural of Gas Pipelines
1997-2016 - GAS MALAYSIA SDN BHD
30″ Double Stopple with 24″ Temporary Bypass onto Natural Gas Pipeline for EPCC for Pipeline Replacement Project at Sg. Skudai, Johor (PIRESS)